    Hobbies Fair Isle Snowflake Ornament - Easy



    GAUGE:
    EXACT GAUGE IS NOT ESSENTIAL FOR THIS PROJECT BE SURE TO CHECK YOUR GAUGE. When you match the gauge in a pattern, your project will be the size specified in the pattern and the materials specified in the pattern will be sufficient. If it takes you fewer stitches and rows to make a 4 in. [10 cm] square, try using a smaller size hook or needles; if more stitches and rows, try a larger size hook or needles.
    STITCH EXPLANATION:













    M1 (make 1) An increase worked by lifting the horizontal thread lying between the needles and placing it onto left needle. Knit this new stitch through the back loop.
    NOTES:
    Work chart from right to left on RS rows, from left to right on WS rows. Carry color not in use across WS of work.



































    FAIR ISLE SNOWFLAKE ORNAMENT

    With A, cast on 6 sts.

    Row 1: Purl.

    Row 2: K in front and back of each st across – 12 sts.

    Rows 3, 5, 7, 9 , 11 and 13: With A, purl.

    Row 4: With A, *M1, k1, rep from * – 24 sts.

    Row 6: With A, *M1, k2, rep from * across – 36 sts.

    Row 8: With A, *M1, k3, rep from * across – 48 sts.

    Row 10: With A, *M1, k4, rep from * across – 60 sts.

    Row 12: With A, *M1, k5, rep from * across – 72 sts.

    Row 14: With A, knit, increase 5 sts evenly spaced across – 77 sts.

    Row 15: With A, purl.

    Row 16: With A, k2; *work Row 1 of chart across next 23 sts, with A, k2, rep from * 2 times more.

    Continue as established, working in Stockinette st (k on RS, p on WS), following chart and keeping first and last 2 sts, and 2 sts between each chart rep in A, until 23 rows of chart have been completed.

    Next Row: With A, purl.

    Next Row: With A, knit, decrease 5 sts evenly spaced across – 72 sts.

    Next Row: With A, purl.

    Next Row: With A, *K4, k2tog, rep from * across – 60 sts.

    Next Row: With A, purl.

    Next Row: With A, *K3, k2tog, rep from * across – 48 sts.

    Next Row: With A, purl.

    Next Row: With A, *K2, k2tog, rep from * across – 36 sts.

    Next Row: With A, purl.

    Next Row: With A, *K1, k2tog, rep from * across – 24 sts.

    Next Row: With A, purl.

    Next Row: With A, *K2tog, rep from * across – 12 sts.

    Next Row: With A, purl.

    Rep last 2 rows once more – 6 sts.

    Next Row: Change to double pointed needles. With A, k2tog across – 3 sts.

    Hanging Loop

    Do not turn work. Slide sts to other end of needle and k3.

    Continue to slide sts to other end of needle and k3 until cord measures about 7 in (18 cm). Bind off. Sew bound-off end of cord to beginning to make loop.

    FINISHING

    Wrap piece around foam ball and sew seam, drawing in sts of bound-off and cast-on edges. Sew bound off end of cord to top of Ornament.

    Weave in ends.































































    ABBREVIATIONS / REFERENCES

    Click for explanation and illustration



    k = knit k2tog = knit 2 together
    p = purl rep = repeat(s)(ing)
    RS = right side sl = slip
    st(s) = stitch(es) WS = wrong side












    Last edited by Karenne; December 5th, 2008 at 04:15 PM.
    I smile because I have no idea what is going on.


Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •